Field manual · 8 guides
How to hire machinery the right way
Practical guides for the decisions between scope, supplier, delivery, production and off-hire. Each covers what to measure, what to confirm in writing and a field checklist.
The guides
Choose the decision in front of you
A hire request works better when it describes the work, the constraints and the evidence, not just a familiar machine name.

FM-01
Read the workface before choosing the machine
A machine brief starts with material, geometry, ground and movement—not the model name printed on an old scope.
Read guide →
FM-02
Build a specification that can actually be transported
Operating capacity is irrelevant if the nominated machine cannot reach, enter or unload at the workface.
Read guide →
FM-03
Design a balanced earthworks spread
Excavators, loaders, trucks, water and compaction create one production system. The slowest interface sets the pace.
Read guide →
FM-04
Plan a controlled lift before requesting crane capacity
Crane tonnage is only the label. Radius, configuration, ground and rigging determine the real lift.
Read guide →
FM-05
Specify compact plant for a constrained urban workface
Compact does not simply mean small. Reach, tail swing, attachment flow, noise and movement paths must work together.
Read guide →
FM-06
Write the breakdown response before the first shift
Support capability is part of the machine specification when downtime carries programme or safety consequences.
Read guide →
FM-07
Compare machinery hire quotes on equal terms
The lowest visible rate can conceal transport, minimum hours, attachments, fuel, support and off-hire differences.
Read guide →
FM-08
Close the hire without a commercial tail
Off-hire succeeds when notice, condition, cleaning, collection and evidence were agreed before dispatch.
Read guide →From selection to close-out