Shutdown work

Availability, redundancy and permit readiness outweigh normal utilisation.

Shutdown work: machinery hire guide

Availability, redundancy and permit readiness outweigh normal utilisation.

01 · Why it mattersWhat actually decides the outcome

Shutdowns at plants, mines and facilities happen in fixed windows where every hour of delay costs lost production. Cranes, access equipment, welders, compressors and temporary power must be reserved, inducted and documented before the window opens. Backup equipment and fast support matter more than utilisation.

02 · Before you hireWhat to check

  • Reservation and availability confirmation
  • Documentation and plant-entry approval
  • Inducted operators and crews
  • Backup units for critical tasks
  • Technician on site or on call
  • Demobilisation plan

03 · Supplier questionsWhat to ask the hire company

  1. Is the equipment reserved exclusively for our dates?
  2. What backup units can you hold?
  3. Can your technicians be on site during the shutdown?
  4. What documentation do you need from us before mobilisation?
Common mistake

Relying on a single crane with no backup, then losing a shift when it breaks down.

04 · Put it in writingConfirm the assumptions

Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.

05 · Find suppliersCrane Hire suppliers

Franna/pick-and-carry, all-terrain, crawler and truck-mounted cranes, dry or wet hire with crew. Browse all crane hire suppliers and selection notes.

NextRelated guides

Supplier directory

Crane Hire suppliers

View all