Machinery transport · TE-06
Mobilisation evidence
Record condition, load restraint, departure and arrival.

Record condition, load restraint, departure and arrival.
01 · Why it mattersWhat actually decides the outcome
Recording condition, restraint, departure and arrival protects both parties if damage or disputes occur.
02 · Before you hireWhat to check
- Pre-departure photos
- Load restraint
- Hour meter at departure
- Arrival condition
- Delivery docket sign-off
- Reported damage
03 · Supplier questionsWhat to ask the hire company
- Do you provide dispatch condition reports?
- Who signs on arrival?
- How is transport damage handled?
Signing a delivery docket without inspecting the machine.
04 · Put it in writingConfirm the assumptions
Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.
05 · Find suppliersTrucks and Transport Hire suppliers
Tippers, water carts, floats, prime movers, tilt trays and service trucks — often with a driver. Browse all trucks and transport hire suppliers and selection notes.