Plant productivity · PL-04
Fuel and refuelling
Plan burn rate, storage, access and refuelling without breaking the shift.

Plan burn rate, storage, access and refuelling without breaking the shift.
01 · Why it mattersWhat actually decides the outcome
Fuel is a daily production input. Burn rate varies with load and operator. Refuelling takes machine and operator time. Storage and delivery must meet environmental and safety requirements. A fuel plan protects the shift window and the budget.
02 · Before you hireWhat to check
- Estimated burn rate at expected load
- Tank capacity and hours per tank
- Refuelling method: fuel truck, pod or site tank
- Spill kits and bunding
- Who pays for fuel and how it's measured
- Remote site fuel logistics
03 · Supplier questionsWhat to ask the hire company
- What is the typical fuel burn for this machine on this work?
- Is the machine returned full or charged by the litre?
- Can you provide on-site refuelling?
Scheduling refuelling in the middle of peak production instead of at breaks or shift change.
04 · Put it in writingConfirm the assumptions
Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.